30:00

MCQ Quiz

1. In the context of a manufacturing company, which decision pertains to the method of delivering products to customers i.e “How to reach the products to the customers?”




2. Which of the following relates to determining the space and capacity requirements for each economic activity center?




3. What is the term for the non-linear iterative process aimed at understanding user needs, challenging assumptions, redefining problems, and creating innovative solutions?




4. A solution that meets the non-negative constraints of a general linear programming problem is referred to as a:




5. How often are ISO Standards reviewed?




6. In a production line with five work centers, which center is the bottleneck if the actual output is 270 units per shift?

Work Centre P Q R S T
Shift 350 320 360 325 300




7. In maintenance management, which cost must be balanced with the cost of premature replacement?




8. What technique involves creating a model of a real phenomenon and conducting experiments on it?




9. Which term refers to the specific job-specific goals of individual employees?




10. What describes a situation where consumers prefer products from established companies?




11. The significant rethinking and radical redesign of business processes to achieve major improvements in performance critical contemporary measures of performance such as cost, quality, service and speed measures is known as:




12. What is the term for a large volume of data that is continuously growing over time?




13. If the expected time for an activity is 7 days, with optimistic and pessimistic times of 3 days and 15 days respectively, what is the most likely duration for the activity?




14. In SWOT Analysis, what does the letter "C" stand for?




15. What challenges may arise when developing Key Result Areas (KRAs)?